VILLA TERRACE WREC

Substation-Adjacent

Citrus, Florida · SERC

DC Readiness
55.9
Good / 100

VILLA TERRACE WREC is a substation-adjacent datacenter candidate site in Citrus, Florida, interconnecting through SERC. It screens at 55.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationVILLA TERRACE WREC
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPFlexential - Tampa/North (TPA03)
IXP distance53.0 mi
Fiber providers9
Fiber coverage23.8%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterFlexential Tampa - North
DC distance53.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity8.09¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,801

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track VILLA TERRACE WREC

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
75
Fiber connectivity12%
50
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Citrus, ranked by DC Readiness.

Sites near VILLA TERRACE WREC
SiteTypeVoltageCapacityQueue waitScore
CRYSTAL RIVERSubstation-Adjacent500 kV1,000 MW1.0 yrs65.8
TAP155704Substation-Adjacent230 kV300 MW1.0 yrs61.1
HOLDERSubstation-Adjacent230 kV300 MW1.0 yrs60.7
UNKNOWN156846Substation-Adjacent230 kV300 MW1.0 yrs60.6
EC Coal Citrus CountyGreenfield——3.6 yrs60.6
OZ CitrusGreenfield——3.6 yrs59.8
EC Near Crystal RiverGreenfield——3.6 yrs59.4
Greenfield (CENTRAL FLORIDA - UNKNOWN16215)Greenfield500 kV1,000 MW1.0 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for VILLA TERRACE WREC, Citrus is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.