Skip to content
Gridcensus

VILLA TERRACE WREC

Substation-Adjacent

Citrus, Florida · SERC

DC Readiness
52.1
Fair / 100

VILLA TERRACE WREC is a substation-adjacent datacenter candidate site in Citrus, Florida, interconnecting through SERC. It screens at 52.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationVILLA TERRACE WREC
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPFlexential - Tampa/North (TPA03)
IXP distance53.0 mi
Fiber providers9
Fiber coverage23.8%

Site characteristics

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterFlexential Tampa - North
DC distance53.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity8.09¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,801

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
75
Fiber connectivity12%
19
Energy cost10%
50
Water risk8%
76
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Citrus, ranked by DC Readiness.

Sites near VILLA TERRACE WREC
SiteTypeVoltageCapacityQueue waitScore
CRYSTAL RIVERSubstation-Adjacent500 kV1,000 MW1.0 yrs61.2
EC Coal Citrus CountyGreenfield3.6 yrs60.6
OZ CitrusGreenfield3.6 yrs59.8
EC Near Crystal RiverGreenfield3.6 yrs59.4
Levy Nuclear PlantBrownfield2,500 MW3.6 yrs58.5
EC Near Crystal RiverGreenfield3.6 yrs58.4
TAP155704Substation-Adjacent230 kV300 MW1.0 yrs56.5
HOLDERSubstation-Adjacent230 kV300 MW1.0 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for VILLA TERRACE WREC, Citrus. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.