Skip to content
Gridcensus

UNKNOWN108506

Substation-Adjacent

Brevard County, Florida · SERC

DC Readiness
60.7
Good / 100

UNKNOWN108506 is a substation-adjacent datacenter candidate site in Brevard County, Florida, interconnecting through SERC. It screens at 60.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN108506
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityFLORIDA POWER & LIGHT COinvestor ownedfavorable to large load · terms ≥ 50 MWLarge Load Contract Service (LLCS, ≥50 MW) · 90% min take · 20 yr

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPSD Data Center
IXP distance11.4 mi
Fiber providers9
Fiber coverage58.3%

Site characteristics

Land contactBrevard County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterSD Data Center
DC distance11.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.02¢/kWh
Industrial electricity8.73¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$7,712

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN108506

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
65
Fiber connectivity12%
81
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Brevard County, ranked by DC Readiness.

Sites near UNKNOWN108506
SiteTypeVoltageCapacityQueue waitScore
POINSETTSubstation-Adjacent500 kV1,000 MW3.7 yrs67.2
CAPE CANAVERALSubstation-Adjacent230 kV300 MW3.7 yrs67.2
VIERASubstation-Adjacent230 kV300 MW3.7 yrs65.3
UNKNOWN120180Substation-Adjacent230 kV300 MW3.7 yrs64.8
SARNOSubstation-Adjacent230 kV300 MW3.7 yrs64.7
MALABARSubstation-Adjacent230 kV300 MW3.7 yrs64.0
UNKNOWN120277Substation-Adjacent230 kV300 MW3.7 yrs63.6
UNKNOWN108545Substation-Adjacent230 kV300 MW3.7 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN108506, Brevard County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.