DC Readiness
54.0
Fair / 100

TAP170934 is a substation-adjacent datacenter candidate site in Kent County, Delaware, interconnecting through PJM. It screens at 54.0/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP170934
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityDELMARVA POWERinvestor ownedmoderate to large load · terms ≥ 25 MWNext Generation Energy Act large-load provisions

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth68
Avg queue wait3.8 yrs

Connectivity

Nearest IXPUSNAMES-NET
IXP distance41.2 mi
Fiber providers5
Fiber coverage39.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score82/100

Location context

Nearest datacenterUSNAMES-NET
DC distance41.2 mi
County hazard (FEMA NRI)Relatively Low (18)
DC tax incentiveNo
Commercial electricity11.20¢/kWh
Industrial electricity9.24¢/kWh
Cooling degree days1,100
Heating degree days4,500
Land price / acre$8,679

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP170934

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
51
Fiber connectivity12%
62
Energy cost10%
50
Water risk7%
84
Natural hazard6%
82
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
39
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Kent County, ranked by DC Readiness.

Sites near TAP170934
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN170928Substation-Adjacent230 kV300 MW3.8 yrs60.1
CARTANZASubstation-Adjacent230 kV300 MW3.8 yrs60.0
EC Near McKee RunGreenfield——1.5 yrs59.4
EC Near McKee RunGreenfield——1.5 yrs58.7
OZ KentGreenfield——1.5 yrs58.3
EC Near McKee RunGreenfield——1.5 yrs57.1
EC Near McKee RunGreenfield——1.5 yrs56.9
UNKNOWN128194Substation-Adjacent138 kV100 MW3.8 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.