Datacenter Sites in Contra Costa, California

Contra Costa has 250 scored datacenter candidate sites averaging 47.9/100 DC Readiness, with a catalogued aggregate of 20,667 MW. FEMA rates local natural-hazard risk as "Relatively High".

250
Candidate sites
47.9/100
Avg DC Readiness
20,667 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Contra Costa

Site-selection context for Contra Costa

No
Datacenter tax incentive
29.96¢/kWh
Commercial electricity
22.93¢/kWh
Industrial electricity
6
Fiber providers
High
Water stress
$9,199
Land price / acre
1,000
Cooling degree days
2,500
Heating degree days
59°F
Mean annual temp

By site type

Top datacenter sites in Contra Costa

Top datacenter sites in Contra Costa
SiteTypeVoltageCapacityQueue waitScore
EMBARCADEROSubstation-Adjacent230 kV300 MW8.2 yrs57.5
Phillips 66 Carbon PlantBrownfield60 kV27 MW5.7 yrs54.3
SOBRANTESubstation-Adjacent230 kV300 MW8.2 yrs53.4
MORAGASubstation-Adjacent230 kV300 MW8.2 yrs53.2
OAKLAND ISubstation-Adjacent115 kV100 MW8.2 yrs52.7
BAHIASubstation-Adjacent230 kV300 MW8.2 yrs52.3
ROSSMOOR TAP 2Substation-Adjacent230 kV300 MW8.2 yrs52.2
ROSSMOORSubstation-Adjacent230 kV300 MW8.2 yrs52.2
TECHNICAL ECOLOGICAL S. R. RESEARCH CENTERSubstation-Adjacent230 kV300 MW8.2 yrs51.8
TASSAJARASubstation-Adjacent230 kV300 MW8.2 yrs51.2
TESOROSubstation-Adjacent230 kV300 MW8.2 yrs51.0
OAKLAND LSubstation-Adjacent115 kV100 MW8.2 yrs50.9
NCPA ALAMEDASubstation-Adjacent115 kV100 MW8.2 yrs50.9
CARTWRIGHTSubstation-Adjacent115 kV100 MW8.2 yrs50.8
OAKLAND DSubstation-Adjacent115 kV100 MW8.2 yrs50.8
EC Near Richmond CogenGreenfield5.7 yrs50.7
MARITIMESubstation-Adjacent115 kV100 MW8.2 yrs50.7
OAKLAND XSubstation-Adjacent115 kV100 MW8.2 yrs50.5
JENNEYSubstation-Adjacent115 kV100 MW8.2 yrs50.5
HILLSIDESubstation-Adjacent115 kV100 MW8.2 yrs50.4
CLAREMONTSubstation-Adjacent115 kV100 MW8.2 yrs50.4
OZ Contra CostaGreenfield5.7 yrs50.3
EC Near Richmond CogenGreenfield5.7 yrs50.2
EC Near Richmond CogenGreenfield5.7 yrs49.6
OWENS BROCKWAYSubstation-Adjacent115 kV100 MW8.2 yrs49.5

Contra Costa datacenter FAQ

How many datacenter sites are in Contra Costa?
250 scored datacenter candidate sites, averaging 47.9/100 DC Readiness.
Does Contra Costa offer datacenter tax incentives?
No datacenter-specific tax incentive is on record for Contra Costa in our dataset.
What is the natural-hazard risk in Contra Costa?
FEMA's National Risk Index rates Contra Costa as "Relatively High" (score 48).
What are industrial electricity rates in Contra Costa?
Average industrial electricity is 22.93¢/kWh and commercial is 29.96¢/kWh in Contra Costa.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Contra Costa, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.