UNKNOWN107874

Substation-Adjacent

Woodruff, Arkansas · MISO

DC Readiness
53.3
Fair / 100

UNKNOWN107874 is a substation-adjacent datacenter candidate site in Woodruff, Arkansas, interconnecting through MISO. It screens at 53.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN107874
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityENTERGY ARKANSAS LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait2.8 yrs

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance27.9 mi
Fiber providers4
Fiber coverage62.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterARE-ON Forrest City
DC distance27.9 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.08¢/kWh
Industrial electricity11.47¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,916

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN107874

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
46
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Woodruff, ranked by DC Readiness.

Sites near UNKNOWN107874
SiteTypeVoltageCapacityQueue waitScore
EC FFE Woodruff CountyGreenfield1.4 yrs59.0
EC Near Carl BaileyGreenfield1.4 yrs58.1
EC Near Carl BaileyGreenfield1.4 yrs57.9
EC Near Carl BaileyGreenfield1.4 yrs57.3
UNKNOWN107875Substation-Adjacent161 kV100 MW2.8 yrs57.1
EC Near Carl BaileyGreenfield1.4 yrs56.7
UNKNOWN121172Substation-Adjacent161 kV100 MW2.8 yrs56.0
EC Near Carl BaileyGreenfield1.4 yrs55.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.