MABELVALE SUBSTATION

Substation-Adjacent

Pulaski County, Arkansas · MISO

DC Readiness
66.1
Good / 100

MABELVALE SUBSTATION is a substation-adjacent datacenter candidate site in Pulaski County, Arkansas, interconnecting through MISO. It screens at 66.1/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMABELVALE SUBSTATION
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW

Speed to power

ISO / RTO regionMISO
Queue depth101
Avg queue wait2.8 yrs

Connectivity

Nearest IXPTIerPoint Little Rock
IXP distance8.6 mi
Fiber providers11
Fiber coverage72.6%

Site characteristics

Former usegas
Existing capacity78 MW
Retirement date2016-06-01

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterTierPoint Little Rock
DC distance8.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity11.98¢/kWh
Industrial electricity7.54¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$4,602

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power15%
46
Fiber connectivity12%
78
Energy cost10%
50
Water risk8%
84
Natural hazard8%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Pulaski County, ranked by DC Readiness.

Sites near MABELVALE SUBSTATION
SiteTypeVoltageCapacityQueue waitScore
WRIGHTSVILLESubstation-Adjacent500 kV1,000 MW2.8 yrs64.5
MAYFLOWERSubstation-Adjacent500 kV1,000 MW2.8 yrs64.2
OZ PulaskiGreenfield1.4 yrs64.0
EC Near Cecil LynchGreenfield1.4 yrs61.9
EC Near Archer Daniels Midland Little RockGreenfield1.4 yrs61.0
OZ PulaskiGreenfield1.4 yrs60.1
EC Near Cecil LynchGreenfield1.4 yrs60.1
EC Near Cecil LynchGreenfield1.4 yrs59.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.