Datacenter Sites in Nevada, Arkansas

Nevada has 15 scored datacenter candidate sites averaging 59.4/100 DC Readiness, with a catalogued aggregate of 4,800 MW. FEMA rates local natural-hazard risk as "Relatively High".

15
Candidate sites
59.4/100
Avg DC Readiness
4,800 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 7 in Nevada

Site-selection context for Nevada

No
Datacenter tax incentive
11.65¢/kWh
Commercial electricity
7.45¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$2,507
Land price / acre
1,900
Cooling degree days
3,400
Heating degree days
60°F
Mean annual temp

By site type

Top datacenter sites in Nevada

Top datacenter sites in Nevada
SiteTypeVoltageCapacityQueue waitScore
OZ NevadaGreenfield1.4 yrs60.5
EC FFE Nevada CountyGreenfield1.4 yrs56.7
TAP142011Substation-Adjacent115 kV100 MW2.8 yrs56.0
TAP150158Substation-Adjacent115 kV100 MW2.8 yrs55.8
UNKNOWN107715Substation-Adjacent115 kV100 MW2.8 yrs54.6
UNKNOWN121730Substation-Adjacent115 kV100 MW2.8 yrs54.4
Mine SiteFormer Mine2.8 yrs49.3

Nevada datacenter FAQ

How many datacenter sites are in Nevada?
15 scored datacenter candidate sites, averaging 59.4/100 DC Readiness.
Does Nevada offer datacenter tax incentives?
No datacenter-specific tax incentive is on record for Nevada in our dataset.
What is the natural-hazard risk in Nevada?
FEMA's National Risk Index rates Nevada as "Relatively High" (score 38).
What are industrial electricity rates in Nevada?
Average industrial electricity is 7.45¢/kWh and commercial is 11.65¢/kWh in Nevada.

Dataset updated . Screening estimates derived from public data sources.