Former Harold's Auction Building
IndustrialMississippi County, Arkansas · MISO
Former Harold's Auction Building is a industrial datacenter candidate site in Mississippi County, Arkansas, interconnecting through MISO. It screens at 41.3/100 DC Readiness.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Mississippi County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| DELL POWER STATION | Substation-Adjacent | 500 kV | 1,000 MW | 1.4 yrs | 70.6 |
| DELL | Substation-Adjacent | 500 kV | 1,000 MW | 1.4 yrs | 68.6 |
| PLUM POINT ENERGY STATION | Substation-Adjacent | 500 kV | 1,000 MW | 1.4 yrs | 67.6 |
| UNKNOWN107704 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 63.3 |
| Greenfield (DELL - JONESBORO EHV) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 62.8 |
| UNKNOWN121084 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 62.5 |
| UNKNOWN108138 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 62.3 |
| UNKNOWN121082 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 62.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Former Harold's Auction Building, Mississippi County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.