Skip to content
Gridcensus

Miller County, Arkansas · MISO

DC Readiness
50.6
Fair / 100

TAP162052 is a substation-adjacent datacenter candidate site in Miller County, Arkansas, interconnecting through MISO. It screens at 50.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP162052
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityENTERGY ARKANSAS LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait2.8 yrs

Connectivity

Nearest IXPARE-ON Hope
IXP distance34.8 mi
Fiber providers6
Fiber coverage96.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterARE-ON Hope
DC distance34.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.17¢/kWh
Industrial electricity6.92¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,500

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP162052

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
28
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Miller County, ranked by DC Readiness.

Sites near TAP162052
SiteTypeVoltageCapacityQueue waitScore
TAP308045Substation-Adjacent345 kV600 MW1.7 yrs59.2
OZ MillerGreenfield——1.4 yrs58.5
TEXARKANA NO. 02Substation-Adjacent138 kV100 MW2.8 yrs54.6
EC FFE Miller CountyGreenfield——1.4 yrs54.6
TAP305446Substation-Adjacent138 kV100 MW1.7 yrs54.6
TAP305443Substation-Adjacent138 kV100 MW1.7 yrs54.3
SUGAR HILLSubstation-Adjacent138 kV100 MW2.8 yrs54.1
UNKNOWN150150Substation-Adjacent138 kV100 MW2.8 yrs53.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for TAP162052, Miller County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.