Swift Building

Industrial

Miller County, Arkansas · MISO

DC Readiness
43.4
Fair / 100

Swift Building is a industrial datacenter candidate site in Miller County, Arkansas, interconnecting through MISO. It screens at 43.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth161

Connectivity

Nearest IXPARE-ON Hope
IXP distance30.3 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterARE-ON Hope
DC distance30.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.17¢/kWh
Industrial electricity6.92¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,500

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
55
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Miller County, ranked by DC Readiness.

Sites near Swift Building
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN301051Substation-Adjacent345 kV600 MW3.4 yrs72.6
TAP308045Substation-Adjacent345 kV600 MW3.4 yrs69.8
UNKNOWN150150Substation-Adjacent138 kV100 MW3.4 yrs67.4
SUGAR HILLSubstation-Adjacent138 kV100 MW3.4 yrs67.3
UNKNOWN309392Substation-Adjacent138 kV100 MW3.4 yrs65.3
TAP305446Substation-Adjacent138 kV100 MW3.4 yrs62.5
Greenfield (UNKNOWN150150 - UNKNOWN300032)Greenfield138 kV100 MW3.4 yrs61.1
Greenfield (UNKNOWN150150 - TEXARKANA NO. )Greenfield138 kV100 MW3.4 yrs60.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.