Skip to content
Gridcensus

UNKNOWN108126

Substation-Adjacent

Madison County, Arkansas · MISO

DC Readiness
52.5
Fair / 100

UNKNOWN108126 is a substation-adjacent datacenter candidate site in Madison County, Arkansas, interconnecting through MISO. It screens at 52.5/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN108126
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityCARROLL ELECTRIC COOP CORP - (AR)cooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait2.8 yrs

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance27.4 mi
Fiber providers4
Fiber coverage92.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance27.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity11.23¢/kWh
Industrial electricity8.10¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$4,232

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Get alerts

Track UNKNOWN108126

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
46
Fiber connectivity12%
62
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Madison County, ranked by DC Readiness.

Sites near UNKNOWN108126
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN108129Substation-Adjacent69 kV50 MW2.8 yrs54.3
UNKNOWN108128Substation-Adjacent69 kV50 MW2.8 yrs54.2
UNKNOWN108130Substation-Adjacent69 kV50 MW2.8 yrs49.7
Butler Elementary SchoolIndustrial2.8 yrs48.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN108126, Madison County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.