UNKNOWN149564

Substation-Adjacent

Howard County, Arkansas · MISO

DC Readiness
51.9
Fair / 100

UNKNOWN149564 is a substation-adjacent datacenter candidate site in Howard County, Arkansas, interconnecting through MISO. It screens at 51.9/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN149564
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityRICH MOUNTAIN ELEC COOP, INCnot available

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait2.8 yrs

Connectivity

Nearest IXPARE-ON Hope
IXP distance49.0 mi
Fiber providers6
Fiber coverage76.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterARE-ON Hope
DC distance49.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity11.27¢/kWh
Industrial electricity7.28¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$4,175

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN149564

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
46
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Howard County, ranked by DC Readiness.

Sites near UNKNOWN149564
SiteTypeVoltageCapacityQueue waitScore
OZ HowardGreenfield——1.4 yrs61.7
EC FFE Howard CountyGreenfield——1.4 yrs57.3
UNKNOWN108057Substation-Adjacent138 kV100 MW2.8 yrs56.7
UNKNOWN121779Substation-Adjacent138 kV100 MW2.8 yrs55.2
MIDWAY M.P.Substation-Adjacent69 kV50 MW2.8 yrs54.3
TAP149974Substation-Adjacent69 kV50 MW2.8 yrs54.1
UNKNOWN117217Substation-Adjacent69 kV50 MW2.8 yrs54.1
NORTH NASHVILLESubstation-Adjacent69 kV50 MW2.8 yrs53.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN149564, Howard County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.