UNKNOWN108052 is a substation-adjacent datacenter candidate site in Hot Spring County, Arkansas, interconnecting through MISO. It screens at 55.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN108052
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityENTERGY ARKANSAS LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait2.8 yrs

Connectivity

Nearest IXPTIerPoint Little Rock
IXP distance30.7 mi
Fiber providers4
Fiber coverage79.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterTierPoint Little Rock
DC distance30.7 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity12.25¢/kWh
Industrial electricity6.98¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,629

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN108052

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
46
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Hot Spring County, ranked by DC Readiness.

Sites near UNKNOWN108052
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117209Substation-Adjacent500 kV1,000 MW2.8 yrs67.7
UNKNOWN117262Substation-Adjacent500 kV1,000 MW2.8 yrs63.6
TAP149964Substation-Adjacent500 kV1,000 MW2.8 yrs63.6
EC Near Lake CatherineGreenfield——1.4 yrs59.9
EC Near Hot Spring Generating FacilityGreenfield——1.4 yrs58.6
EC FFE Hot Spring CountyGreenfield——1.4 yrs57.6
EC Near Hot Spring Generating FacilityGreenfield——1.4 yrs57.6
EC Near Lake CatherineGreenfield——1.4 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN108052, Hot Spring County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.