Skip to content
Gridcensus

Franklin County, Arkansas · MISO

DC Readiness
51.4
Fair / 100

TAP154817 is a substation-adjacent datacenter candidate site in Franklin County, Arkansas, interconnecting through MISO. It screens at 51.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP154817
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW

Speed to power

ISO / RTO regionMISO
Queue depth101
Avg queue wait2.8 yrs

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance44.3 mi
Fiber providers7
Fiber coverage98.7%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance44.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.80¢/kWh
Industrial electricity6.64¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,245

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
39
Fiber connectivity12%
45
Energy cost10%
50
Water risk8%
84
Natural hazard8%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Franklin County, ranked by DC Readiness.

Sites near TAP154817
SiteTypeVoltageCapacityQueue waitScore
EC FFE Franklin CountyGreenfield1.4 yrs58.5
EC Coal Franklin CountyGreenfield1.4 yrs56.5
HELBERGSubstation-Adjacent161 kV100 MW2.8 yrs51.4
TAP154323Substation-Adjacent161 kV100 MW2.8 yrs51.4
OZARKSubstation-Adjacent161 kV100 MW2.8 yrs51.4
TAP154811Substation-Adjacent161 kV100 MW2.8 yrs51.4
TAP154812Substation-Adjacent161 kV100 MW2.8 yrs51.4
TAP154816Substation-Adjacent161 kV100 MW2.8 yrs51.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154817, Franklin County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.