Faulkner County, Arkansas · MISO

DC Readiness
52.1
Fair / 100

TYLER is a substation-adjacent datacenter candidate site in Faulkner County, Arkansas, interconnecting through MISO. It screens at 52.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTYLER
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW

Speed to power

ISO / RTO regionMISO
Queue depth101
Avg queue wait2.8 yrs

Connectivity

Nearest IXPTIerPoint Little Rock
IXP distance24.1 mi
Fiber providers10
Fiber coverage55.2%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterTierPoint Little Rock
DC distance24.1 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity11.78¢/kWh
Industrial electricity8.29¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$4,679

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
39
Fiber connectivity12%
44
Energy cost10%
50
Water risk8%
84
Natural hazard8%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Faulkner County, ranked by DC Readiness.

Sites near TYLER
SiteTypeVoltageCapacityQueue waitScore
Blaney Hill Solar FarmBrownfield161 kV1 MW2.8 yrs60.0
OZ FaulknerGreenfield1.4 yrs58.5
OZ FaulknerGreenfield1.4 yrs56.3
UNKNOWN108017Substation-Adjacent115 kV100 MW2.8 yrs53.0
UNKNOWN117288Substation-Adjacent161 kV100 MW2.8 yrs52.8
UNKNOWN117289Substation-Adjacent161 kV100 MW2.8 yrs52.6
UNKNOWN117290Substation-Adjacent161 kV100 MW2.8 yrs52.5
UNKNOWN108012Substation-Adjacent161 kV100 MW2.8 yrs52.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TYLER, Faulkner County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.