Skip to content
Gridcensus

UNKNOWN108005

Substation-Adjacent

Cross County, Arkansas · MISO

DC Readiness
51.6
Fair / 100

UNKNOWN108005 is a substation-adjacent datacenter candidate site in Cross County, Arkansas, interconnecting through MISO. It screens at 51.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN108005
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityENTERGY ARKANSAS LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait2.8 yrs

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance20.5 mi
Fiber providers5
Fiber coverage66.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterARE-ON Forrest City
DC distance20.5 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.51¢/kWh
Industrial electricity13.97¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$4,223

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN108005

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
28
Fiber connectivity12%
76
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Cross County, ranked by DC Readiness.

Sites near UNKNOWN108005
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121033Substation-Adjacent161 kV100 MW2.8 yrs56.2
UNKNOWN121034Substation-Adjacent161 kV100 MW2.8 yrs56.0
UNKNOWN121035Substation-Adjacent161 kV100 MW2.8 yrs55.9
EC FFE Cross CountyGreenfield——1.4 yrs55.1
PARKINSubstation-Adjacent161 kV100 MW2.8 yrs54.6
CHERRY VALLEYSubstation-Adjacent161 kV100 MW2.8 yrs54.1
UNKNOWN108001Substation-Adjacent69 kV50 MW2.8 yrs53.3
UNKNOWN107997Substation-Adjacent161 kV100 MW2.8 yrs53.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN108005, Cross County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.