Skip to content
Gridcensus

Abandoned F & S Prestress Concrete Plant

Industrial

Calhoun County, Arkansas · MISO

DC Readiness
46.7
Fair / 100

Abandoned F & S Prestress Concrete Plant is an industrial datacenter candidate site in Calhoun County, Arkansas, interconnecting through MISO. It screens at 46.7/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth101
Avg queue wait2.8 yrs

Connectivity

Nearest IXPARE-ON Hope
IXP distance66.6 mi
Fiber providers4
Fiber coverage88.7%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterARE-ON Hope
DC distance66.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity11.02¢/kWh
Industrial electricity7.74¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$2,591

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 5 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
39
Fiber connectivity12%
68
Energy cost10%
50
Water risk8%
84
Natural hazard8%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Calhoun County, ranked by DC Readiness.

Sites near Abandoned F & S Prestress Concrete Plant
SiteTypeVoltageCapacityQueue waitScore
EC FFE Calhoun CountyGreenfield1.4 yrs55.5
BEARDENSubstation-Adjacent115 kV100 MW2.8 yrs50.5
Abandoned Ford Tractor DealershipIndustrial2.8 yrs47.4
Mine SiteFormer Mine2.8 yrs46.8
Mine SiteFormer Mine2.8 yrs46.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Abandoned F & S Prestress Concrete Plant, Calhoun County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.