Fish Processing Plant (former)

Industrial

Bethel County, Alaska

DC Readiness
49.3
Fair / 100

Fish Processing Plant (former) is an industrial datacenter candidate site in Bethel County, Alaska. It screens at 49.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityALASKA VILLAGE ELEC COOP, INCcooperativerestrictive to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Fiber providers3
Fiber coverage4.9%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score82/100

Location context

County hazard (FEMA NRI)Relatively Low (18)
DC tax incentiveNo
Commercial electricity48.30¢/kWh
Industrial electricity14.24¢/kWh
Cooling degree days0
Heating degree days10,000
Land price / acre$20,972

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Fish Processing Plant (former)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
96
Natural hazard6%
82
Buildability7%
50
Labor market4%
50
DC cluster4%
10
Land / acreage3%
53
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Bethel County, ranked by DC Readiness.

Sites near Fish Processing Plant (former)
SiteTypeVoltageCapacityQueue waitScore
BETHELFederal Excess——1.0 yrs53.3
NWS WSO UAIB BETHEL AK CAMPUS 1 INSTALLATIONFederal Excess——1.0 yrs53.2
BETHELFederal Excess——1.0 yrs53.2
BETHELFederal Excess——1.0 yrs53.1
BETHELFederal Excess——1.0 yrs53.1
BETHELFederal Excess——1.0 yrs52.9
MEKORYUKFederal Excess——1.0 yrs52.9
SPARREVOHN AFFederal Excess——1.0 yrs50.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.