James May Property

Industrial

Perry County, Alabama · SERC

DC Readiness
52.6
Fair / 100

James May Property is an industrial datacenter candidate site in Perry County, Alabama, interconnecting through SERC. It screens at 52.6/100 DC Readiness and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

UtilityALABAMA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPRSA Dexter Avenue Datacenter
IXP distance70.7 mi
Fiber providers3
Fiber coverage27.5%

Site characteristics

Site typeIndustrial
Land contactPerry County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterRSA Dexter Avenue Datacenter
DC distance70.7 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.55¢/kWh
Industrial electricity9.38¢/kWh
Cooling degree days2,100
Heating degree days2,800
Land price / acre$2,354

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; PSC review for very large loads.

DC tax incentiveYes
Large-load threshold≥ 150 MW

Alabama PSC review threshold for large loads.

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track James May Property

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
72
Fiber connectivity12%
56
Energy cost10%
50
Water risk7%
92
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
20

Nearby comparable sites

Other scored datacenter candidate sites in Perry County, ranked by DC Readiness.

Sites near James May Property
SiteTypeVoltageCapacityQueue waitScore
TAP146002Substation-Adjacent115 kV100 MW1.0 yrs59.2
UNKNOWN110572Substation-Adjacent115 kV100 MW1.0 yrs59.1
TAP142369Substation-Adjacent115 kV100 MW1.0 yrs58.8
TAP162012Substation-Adjacent115 kV100 MW1.0 yrs58.3
TAP146003Substation-Adjacent115 kV100 MW1.0 yrs58.3
UNKNOWN173597Substation-Adjacent115 kV100 MW1.0 yrs58.2
UNKNOWN110573Substation-Adjacent115 kV100 MW1.0 yrs57.8
Ronald Miller PropertyIndustrial——1.0 yrs52.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for James May Property, Perry County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.