Chem 4 hope2 is a industrial datacenter candidate site in Marengo County, Alabama, interconnecting through SERC. It screens at 46.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPC Spire Mississippi
IXP distance84.4 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterC Spire Mississippi
DC distance84.4 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.57¢/kWh
Industrial electricity9.10¢/kWh
Cooling degree days2,100
Heating degree days2,800
Land price / acre$2,247

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
74
Fiber connectivity12%
52
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Marengo County, ranked by DC Readiness.

Sites near Chem 4 hope2
SiteTypeVoltageCapacityQueue waitScore
Georgia-Pacific Consr Prods LP-NaheolaBrownfield31 MW66.9
GEORGIA-PACIFIC CONSR PRODS LP-NAHEOLASubstation-Adjacent115 kV100 MW3.7 yrs64.2
UNKNOWN109179Substation-Adjacent115 kV100 MW3.7 yrs64.0
UNKNOWN110568Substation-Adjacent115 kV100 MW3.7 yrs63.4
UNKNOWN109176Substation-Adjacent115 kV100 MW3.7 yrs63.4
UNKNOWN110569Substation-Adjacent115 kV100 MW3.7 yrs63.1
TAP155920Substation-Adjacent115 kV100 MW3.7 yrs63.0
TAP155919Substation-Adjacent115 kV100 MW3.7 yrs61.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Chem 4 hope2, Marengo County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.