Skip to content
Gridcensus

UNKNOWN110918

Substation-Adjacent

Lee County, Alabama · SERC

DC Readiness
61.4
Good / 100

UNKNOWN110918 is a substation-adjacent datacenter candidate site in Lee County, Alabama, interconnecting through SERC. It screens at 61.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110918
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityALABAMA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPAUBix Auburn
IXP distance4.3 mi
Fiber providers7
Fiber coverage64.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterAUBix Auburn
DC distance4.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.61¢/kWh
Industrial electricity9.45¢/kWh
Cooling degree days2,100
Heating degree days2,800
Land price / acre$5,018

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; PSC review for very large loads.

DC tax incentiveYes
Large-load threshold≥ 150 MW

Alabama PSC review threshold for large loads.

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN110918

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
58
Fiber connectivity12%
84
Energy cost10%
50
Water risk7%
92
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
20

Nearby comparable sites

Other scored datacenter candidate sites in Lee County, ranked by DC Readiness.

Sites near UNKNOWN110918
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109844Substation-Adjacent230 kV300 MW3.9 yrs66.3
UNKNOWN109349Substation-Adjacent230 kV300 MW3.9 yrs65.3
UNKNOWN109353Substation-Adjacent230 kV300 MW3.9 yrs65.2
UNKNOWN111266Substation-Adjacent115 kV100 MW3.9 yrs63.0
UNKNOWN110905Substation-Adjacent115 kV100 MW3.9 yrs63.0
TAP143048Substation-Adjacent115 kV100 MW3.9 yrs62.9
UNKNOWN111277Substation-Adjacent115 kV100 MW3.9 yrs62.9
TAP142034Substation-Adjacent115 kV100 MW3.9 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN110918, Lee County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.