UNKNOWN109071 is a substation-adjacent datacenter candidate site in Escambia County, Alabama, interconnecting through SERC. It screens at 58.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN109071
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityALABAMA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPBluBroadband Shell Ave
IXP distance55.0 mi
Fiber providers6
Fiber coverage13.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterBluBroadband Shell Ave
DC distance55.0 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.24¢/kWh
Industrial electricity8.89¢/kWh
Cooling degree days2,100
Heating degree days2,800
Land price / acre$2,763

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; PSC review for very large loads.

DC tax incentiveYes
Large-load threshold≥ 150 MW

Alabama PSC review threshold for large loads.

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN109071

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
74
Fiber connectivity12%
54
Energy cost10%
50
Water risk7%
92
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
20

Nearby comparable sites

Other scored datacenter candidate sites in Escambia County, ranked by DC Readiness.

Sites near UNKNOWN109071
SiteTypeVoltageCapacityQueue waitScore
NORTH BREWTONSubstation-Adjacent500 kV1,000 MW1.0 yrs66.4
UNKNOWN109338Substation-Adjacent115 kV100 MW1.0 yrs58.9
UNKNOWN109109Substation-Adjacent115 kV100 MW1.0 yrs58.8
UNKNOWN110040Substation-Adjacent115 kV100 MW1.0 yrs58.8
UNKNOWN108151Substation-Adjacent115 kV100 MW1.0 yrs58.7
UNKNOWN120665Substation-Adjacent115 kV100 MW1.0 yrs58.7
UNKNOWN110034Substation-Adjacent115 kV100 MW1.0 yrs58.7
TAP150176Substation-Adjacent115 kV100 MW1.0 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN109071, Escambia County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.