Skip to content
Gridcensus

SAM Houston Electric Coop

Organization

20 catalogued assets · 3 states

Total assets
20

SAM Houston Electric Coop is an organization in the GridCensus infrastructure catalog, owning or operating 20 catalogued assets across 3 states. An organization’s existing footprint — its power assets, fiber, land, and facilities — is a strong signal of where it can expand and which markets it already controls. Every asset below links to its full profile.

1
Candidate Sites Owned
19
Transmission Lines

Footprint

Candidate Sites Owned (1)

SiteLocationDC ReadinessCandidate MW
OZ TrinityTrinity, TX52.9/100—

Transmission Lines (19)

LineStateVoltageLength
Line #305489Texas138 kV14.4 mi
Line #302112Nevada138 kV13.7 mi
Line #304605Nevada138 kV9.3 mi
Line #304844Texas138 kV19.9 mi
Line #304879Texas138 kV27.2 mi
Line #309745BC138 kV6.6 mi
Line #311511Texas138 kV7.9 mi
Line #313104Texas138 kV8.7 mi
Line #304912Texas138 kV13.2 mi
Line #307626Texas138 kV8.8 mi
Line #306297Texas138 kV9.7 mi
Line #308280Texas138 kV27.3 mi
Line #308603Texas138 kV19.9 mi
Line #309882Texas138 kV0.0 mi
Line #310006Texas138 kV2.9 mi
Line #312188Texas138 kV7.8 mi
Line #302728Texas138 kV19.4 mi
Line #303029Texas69 kV4.0 mi
Line #311876Texas69 kV15.1 mi

Browse the full transmission-line map →

Is this your organization?

Claim the SAM Houston Electric Coop profile to correct asset details, add capacity and availability, and surface your footprint to site-selection teams using GridCensus.

Dataset updated . Screening estimates derived from public data sources.

Organization records are derived from public infrastructure datasets (EIA, HIFLD, FCC, PNNL, county parcels, PeeringDB) and may be incomplete or lag operational changes. Owner/operator names are normalized for grouping; counts and capacities are catalogued estimates. Confirm ownership and availability directly with the organization.

Go deeper than the public screen

Every site and score for SAM Houston Electric Coop is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.