Skip to content
Gridcensus

Western Sugar Coop - Torrington

Brownfield

Torrington, Goshen, Wyoming · Western Sugar Cooperative

Legacy capacity
2
MW

Western Sugar Coop - Torrington is a natural gas plant in Torrington, Goshen, Wyoming, retired 2019-02-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2019-02-01
EIA plant ID#57967

Grid hookup & remediation

Nearest substation0.2 mi
Operator address400 Main Street, Torrington, WY, 82240
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Western Sugar Coop - Torrington, ranked by DC Readiness.

Candidate sites near Western Sugar Coop - Torrington
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Western Sugar Coop - TorringtonGreenfieldWYGoshen1.7 yrs61.5
OZ GoshenGreenfieldWYGoshen1.7 yrs61.4
EC Near Western Sugar Coop - TorringtonGreenfieldWYGoshen1.7 yrs61.0
EC Near Western Sugar Coop - TorringtonGreenfieldWYGoshen1.7 yrs60.7
STEGALLSubstation-AdjacentNEScotts Bluff County345 kV600 MW3.3 yrs60.5
EC Near Western Sugar Coop - TorringtonGreenfieldWYGoshen1.7 yrs60.5
UNKNOWN202179Substation-AdjacentNEScotts Bluff County345 kV600 MW3.3 yrs60.5
EC Near Western Sugar Coop - TorringtonGreenfieldWYGoshen1.7 yrs60.0

See all datacenter sites in Wyoming

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen