Neil Simpson is a coal plant in Gillette, Campbell, Wyoming, retired 2014-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 22 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity22 MW
Retirement date2014-03-01
EIA plant ID#4150

Grid hookup & remediation

Nearest substation0.0 mi
Operator address13151 Highway Street, Gillette, WY, 82718
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Campbell County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)20,384
IT / tech employment7
Construction employment2,030
Land value$959/acre
Datacenter tax incentiveno_income_tax

Power economics & interconnection

Commercial power rate9.23¢/kWh
Industrial power rate7.25¢/kWh
Load growth (FERC-714)0.3%

Water & cooling

Water stressMedium-High
Public water supply6.0 MGD
Industrial water use0.3 MGD
Cooling degree days300
Mean annual temp41°F

Hazard, flood & connectivity

FEMA risk index10.0 · Very Low
Fiber providers6 · 51% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Neil Simpson

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Neil Simpson, ranked by DC Readiness.

Candidate sites near Neil Simpson
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Neil SimpsonGreenfieldWYCampbell——1.7 yrs65.7
EC Near Neil SimpsonGreenfieldWYCampbell——1.7 yrs65.2
EC Near Neil SimpsonGreenfieldWYCampbell——1.7 yrs65.2
EC Near Neil SimpsonGreenfieldWYCampbell——1.7 yrs65.2
UNKNOWN201359Substation-AdjacentWYCampbell County230 kV300 MW6.9 yrs65.1
UNKNOWN204384Substation-AdjacentWYCampbell County230 kV300 MW6.9 yrs64.9
UNKNOWN201476Substation-AdjacentWYCampbell County230 kV300 MW6.9 yrs64.8
EC Near Neil SimpsonGreenfieldWYCampbell——1.7 yrs64.7

Nearby internet exchanges

See all datacenter sites in Wyoming →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Neil Simpson, Gillette, Campbell, Wyoming. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.