Dave Johnston Mine / Glenrock Wind I
BrownfieldGlenrock, Wyoming
Dave Johnston Mine / Glenrock Wind I is a former mine site in Glenrock, Wyoming. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 119 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Dave Johnston Mine / Glenrock Wind I — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Dave Johnston Mine / Rolling Hills | former mine site | 119 | 0.0 mi | cleanup_complete |
| Dave Johnston Mine / Glenrock Wind III | former mine site | 39 | 0.0 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Dave Johnston Mine / Glenrock Wind I
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Dave Johnston Mine / Glenrock Wind I, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Dave Johnston Mine / Rolling Hills | Brownfield | WY | Converse | 115 kV | 119 MW | 6.9 yrs | 65.0 |
| LATIGO | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 6.9 yrs | 62.3 |
| UNKNOWN201361 | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 6.9 yrs | 62.0 |
| TAP208905 | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 6.9 yrs | 62.0 |
| WINDSTAR | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 6.9 yrs | 61.9 |
| UNKNOWN204404 | Substation-Adjacent | WY | Natrona County | 115 kV | 100 MW | 6.9 yrs | 61.6 |
| UNKNOWN201486 | Substation-Adjacent | WY | Converse County | 230 kV | 300 MW | 6.9 yrs | 61.5 |
| EC Coal Converse County | Greenfield | WY | Converse County | — | — | 1.7 yrs | 61.4 |
Nearby internet exchanges
- Mountain West Technologies - CasperCasper, WY · 3 networks
- ACT CasperCasper, WY · 2 networks
- ACT DouglasDouglas, WY · 2 networks
See all datacenter sites in Wyoming →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.