Stone Brewing Company
BrownfieldRichmond, Virginia
Stone Brewing Company is a former power_plant site in Richmond, Virginia. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for utility-scale generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Stone Brewing Company — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Chesterfield | coal plant | 1,353 | 11.4 mi | — |
| Bellmeade Power Station | natural gas plant | 330 | 3.3 mi | — |
| Spruance Operating Services LLC | coal plant | 115 | 5.7 mi | — |
| Park 500 Philip Morris USA | coal plant | 6 | 17.0 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Stone Brewing Company
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Stone Brewing Company, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ELMONT | Substation-Adjacent | VA | Hanover County | 500 kV | 1,000 MW | 3.8 yrs | 69.3 |
| CHESTERFIELD | Substation-Adjacent | VA | Henrico County | 230 kV | 300 MW | 3.8 yrs | 68.8 |
| CHICKAHOMINY | Substation-Adjacent | VA | Henrico County | 500 kV | 1,000 MW | 3.8 yrs | 68.8 |
| BASIN | Substation-Adjacent | VA | Richmond city | 230 kV | 300 MW | 3.8 yrs | 67.7 |
| MIDLOTHIAN | Substation-Adjacent | VA | Chesterfield County | 500 kV | 1,000 MW | 3.8 yrs | 67.6 |
| SPRUANCE NUG | Substation-Adjacent | VA | Richmond city | 230 kV | 300 MW | 3.8 yrs | 65.9 |
| ELKO | Substation-Adjacent | VA | Henrico County | 230 kV | 300 MW | 3.8 yrs | 65.9 |
| WHITE OAK | Substation-Adjacent | VA | Henrico County | 230 kV | 300 MW | 3.8 yrs | 65.9 |
Nearby internet exchanges
- QTS Richmond (RIC1)Sandston, VA · 22 networks
- Pixel Factory Data CenterAshland, VA · 11 networks
- EdgeConneX Richmond (EDCRIC01)Richmond, VA · 3 networks
- Flexential - Richmond (RIC01/02)Richmond, VA · 1 networks
See all datacenter sites in Virginia →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Stone Brewing Company, Richmond, Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.