Glen Lyn

Brownfield

Glen Lyn, Giles, Virginia · Appalachian Power Co

Legacy capacity
338
MW

Glen Lyn is a coal plant in Glen Lyn, Giles, Virginia, retired 2015-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 338 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity338 MW
Retirement date2015-06-01
EIA plant ID#3776

Grid hookup & remediation

Nearest substation0.1 mi
OperatorAppalachian Power Co
Operator addressU.S Route 460, Glen Lyn, VA, 24093
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Glen Lyn, ranked by DC Readiness.

Candidate sites near Glen Lyn
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVABland County765 kV1,000 MW3.0 yrs67.0
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVABland County765 kV1,000 MW3.0 yrs67.0
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVABland County765 kV1,000 MW3.0 yrs66.3
CHERRY CREEKSubstation-AdjacentWVRaleigh County138 kV100 MW3.0 yrs66.2
Greenfield (JACKSONS FERRY - WYOMING)GreenfieldVAPulaski County765 kV1,000 MW3.0 yrs65.7
UNKNOWN121136Substation-AdjacentVAGiles County138 kV100 MW3.0 yrs65.0
EAST RIVER MOUNTAINSubstation-AdjacentWVMercer County138 kV100 MW3.0 yrs64.9
UNKNOWN131031Substation-AdjacentWVRaleigh County138 kV100 MW3.0 yrs64.9

See all datacenter sites in Virginia

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Glen Lyn, Glen Lyn, Giles, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.