Carbon

Brownfield

Price, Carbon, Utah · PacifiCorp

Legacy capacity
189
MW

Carbon is a coal plant in Price, Carbon, Utah, retired 2015-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 189 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity189 MW
Retirement date2015-04-01
EIA plant ID#3644

Grid hookup & remediation

Nearest substation0.1 mi
OperatorPacifiCorp
Operator addressHwy 6 & Hwy 91, 12 mi N Price, Price, UT, 84526
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Carbon, ranked by DC Readiness.

Candidate sites near Carbon
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUNTINGTONSubstation-AdjacentUTSanpete County345 kV600 MW1.7 yrs68.3
CARBONSubstation-AdjacentUTCarbon County230 kV300 MW1.7 yrs67.2
UNKNOWN202486Substation-AdjacentUTCarbon County138 kV100 MW1.7 yrs65.8
TAP207473Substation-AdjacentUTCarbon County138 kV100 MW1.7 yrs65.8
Greenfield (HUNTINGTON - SPANISH FORK)GreenfieldUTCarbon County345 kV600 MW1.7 yrs64.8
TAP206750Substation-AdjacentUTCarbon County138 kV100 MW1.7 yrs64.7
Greenfield (HUNTINGTON - SPANISH FORK)GreenfieldUTCarbon County345 kV600 MW1.7 yrs64.0
TAP206754Substation-AdjacentUTCarbon County169 kV100 MW1.7 yrs63.7

See all datacenter sites in Utah

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.