Skip to content
Gridcensus

Bloomington Power Plant

Brownfield

Bloomington, Washington, Utah · City of St George

Legacy capacity
2
MW

Bloomington Power Plant is a oil plant in Bloomington, Washington, Utah, retired 2010-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2010-03-01
EIA plant ID#7767

Grid hookup & remediation

Nearest substation0.0 mi
Operator address3780 S. 155 W., Bloomington, UT, 84780
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Washington County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)73,453
IT / tech employment164
Construction employment9,772
Land value$8,684/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate9.00¢/kWh
Industrial power rate7.41¢/kWh
Load growth (FERC-714)1.9%

Water & cooling

Water stressHigh
Public water supply45.5 MGD
Industrial water use0.6 MGD
Cooling degree days1,000
Mean annual temp49°F

Hazard, flood & connectivity

FEMA risk index15.0 · Relatively Low
Fiber providers9 · 68% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Bloomington Power Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Bloomington Power Plant, ranked by DC Readiness.

Candidate sites near Bloomington Power Plant
SiteTypeStateCountyVoltageCapacityQueue waitScore
GREEN VALLEYSubstation-AdjacentUTWashington County230 kV300 MW6.9 yrs65.1
TAP206657Substation-AdjacentUTWashington County230 kV300 MW6.9 yrs65.1
TAP206312Substation-AdjacentUTWashington County230 kV300 MW6.9 yrs65.0
TAP206303Substation-AdjacentUTWashington County230 kV300 MW6.9 yrs65.0
UNKNOWN201442Substation-AdjacentUTWashington County230 kV300 MW6.9 yrs64.9
UNKNOWN206624Substation-AdjacentUTWashington County230 kV300 MW6.9 yrs64.9
SKYLINESubstation-AdjacentUTWashington County230 kV300 MW6.9 yrs64.2
TAP206608Substation-AdjacentUTWashington County230 kV300 MW6.9 yrs64.2

Nearby internet exchanges

See all datacenter sites in Utah →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Bloomington Power Plant, Bloomington, Washington, Utah. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.