Westside Landfill Gas Recovery
BrownfieldAledo, Parker, Texas · WM Renewable Energy LLC
Westside Landfill Gas Recovery is a natural gas plant in Aledo, Parker, Texas, retired 2017-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Westside Landfill Gas Recovery, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EAGLE MOUNTAIN | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 77.0 |
| HICKS | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 75.1 |
| UNKNOWN302319 | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 73.9 |
| UNKNOWN301121 | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 73.9 |
| UNKNOWN300728 | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 73.7 |
| TAP305187 | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 73.5 |
| DECORDOVA | Substation-Adjacent | TX | Hood County | 345 kV | 600 MW | 3.4 yrs | 73.2 |
| ROANOKE | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 73.2 |
Nearby internet exchanges
- QTS Irving - Dallas (DFW1)Irving, TX · 14 networks
- Centersquare Dallas (DFW1)Fort Worth, TX · 7 networks
- CyrusOne Dallas (Lewisville)Lewisville, TX · 5 networks
- QTS Fort Worth (FTW1)Fort Worth, TX · 4 networks
See all datacenter sites in Texas →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.