Westside Landfill Gas Recovery

Brownfield

Aledo, Parker, Texas · WM Renewable Energy LLC

Legacy capacity
2
MW

Westside Landfill Gas Recovery is a natural gas plant in Aledo, Parker, Texas, retired 2017-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2017-10-01
EIA plant ID#57020

Grid hookup & remediation

Nearest substation3.7 mi
OperatorWM Renewable Energy LLC
Operator address12880 Camp Bowie W, Aledo, TX, 76008
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Westside Landfill Gas Recovery, ranked by DC Readiness.

Candidate sites near Westside Landfill Gas Recovery
SiteTypeStateCountyVoltageCapacityQueue waitScore
EAGLE MOUNTAINSubstation-AdjacentTXTarrant County345 kV600 MW3.4 yrs77.0
HICKSSubstation-AdjacentTXTarrant County345 kV600 MW3.4 yrs75.1
UNKNOWN302319Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.9
UNKNOWN301121Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.9
UNKNOWN300728Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.7
TAP305187Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.5
DECORDOVASubstation-AdjacentTXHood County345 kV600 MW3.4 yrs73.2
ROANOKESubstation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.2

Nearby internet exchanges

See all datacenter sites in Texas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen