Thomas C Ferguson

Brownfield

Horseshoe Bay, Llano, Texas · Lower Colorado River Authority

Legacy capacity
446
MW

Thomas C Ferguson is a natural gas plant in Horseshoe Bay, Llano, Texas, retired 2013-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 446 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity446 MW
Retirement date2013-09-01
EIA plant ID#4937

Grid hookup & remediation

Nearest substation0.1 mi
OperatorLower Colorado River Authority
Operator address2001 Ferguson Rd., Horseshoe Bay, TX, 78654
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Thomas C Ferguson, ranked by DC Readiness.

Candidate sites near Thomas C Ferguson
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN305635Substation-AdjacentTXHays County138 kV100 MW3.4 yrs63.8
UNKNOWN310044Substation-AdjacentTXLlano County138 kV100 MW3.4 yrs63.6
LAKEWAYSubstation-AdjacentTXHays County138 kV100 MW3.4 yrs63.2
UNKNOWN308879Substation-AdjacentTXBlanco County138 kV100 MW3.4 yrs63.1
UNKNOWN308994Substation-AdjacentTXBurnet County138 kV100 MW3.4 yrs62.3
UNKNOWN307824Substation-AdjacentTXBurnet County138 kV100 MW3.4 yrs62.2
UNKNOWN302864Substation-AdjacentTXBurnet County138 kV100 MW3.4 yrs62.0
UNKNOWN301931Substation-AdjacentTXBurnet County138 kV100 MW3.4 yrs61.6

See all datacenter sites in Texas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Thomas C Ferguson, Horseshoe Bay, Llano, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.