Skip to content
Gridcensus

Texas City Plant Union Carbide

Brownfield

Texas City, Galveston, Texas · Union Carbide Corp-Texas City

Legacy capacity
40
MW

Texas City Plant Union Carbide is a natural gas plant in Texas City, Galveston, Texas, retired 2014-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 40 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity40 MW
Retirement date2014-10-01
EIA plant ID#50153

Grid hookup & remediation

Nearest substation0.2 mi
Operator address3301 Fifth Avenue South, Texas City, TX, 77592
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Galveston County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)89,308
IT / tech employment30
Construction employment7,647
Land value$15,245/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate9.60¢/kWh
Industrial power rate5.87¢/kWh
Load growth (FERC-714)2.5%

Water & cooling

Water stressMedium-High
Public water supply0.2 MGD
Industrial water use0.1 MGD
Cooling degree days2,600
Mean annual temp65°F

Hazard, flood & connectivity

FEMA risk index55.0 · Very High
Fiber providers9 · 73% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Texas City Plant Union Carbide — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
P H Robinsonnatural gas plant2,3157.9 mi—
Sam Bertronnatural gas plant87525.2 mi—
Cedar Bayounatural gas plant76525.9 mi—
Texas Petrochemicalsnatural gas plant56029.0 mi—
Websternatural gas plant42614.2 mi—
Bayou Cogen Plantnatural gas plant30518.0 mi—
Power Station 3natural gas plant1181.8 mi—
Deer Park Plantnatural gas plant11125.1 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Texas City Plant Union Carbide

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Texas City Plant Union Carbide, ranked by DC Readiness.

Candidate sites near Texas City Plant Union Carbide
SiteTypeStateCountyVoltageCapacityQueue waitScore
Deer Park PlantBrownfieldTXHarris County138 kV111 MW3.4 yrs66.5
ExxonMobil Baytown RefineryBrownfieldTXChambers County138 kV54 MW3.4 yrs61.5
PH ROBINSONSubstation-AdjacentTXGalveston County345 kV600 MW1.7 yrs61.0
UNKNOWN310907Substation-AdjacentTXChambers County345 kV600 MW1.7 yrs61.0
HARRISBURGSubstation-AdjacentTXHarris County345 kV600 MW1.7 yrs60.8
DEEPWATERSubstation-AdjacentTXHarris County345 kV600 MW1.7 yrs60.6
EC Near Sam BertronGreenfieldTXHarris——3.4 yrs59.3
DEER PARK ENERGY CENTERSubstation-AdjacentTXHarris County345 kV600 MW1.7 yrs58.9

Nearby internet exchanges

See all datacenter sites in Texas →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Texas City Plant Union Carbide, Texas City, Galveston, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.