Skyline Gas Recovery

Brownfield

Ferris, Dallas, Texas · WM Renewable Energy LLC

Legacy capacity
6
MW

Skyline Gas Recovery is a natural gas plant in Ferris, Dallas, Texas, retired 2019-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 6 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity6 MW
Retirement date2019-11-01
EIA plant ID#56528

Grid hookup & remediation

Nearest substation0.9 mi
OperatorWM Renewable Energy LLC
Operator address1201 North Central Ave, Ferris, TX, 75125
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Skyline Gas Recovery, ranked by DC Readiness.

Candidate sites near Skyline Gas Recovery
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORWOODSubstation-AdjacentTXDallas County345 kV600 MW3.4 yrs74.5
UNKNOWN309031Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.5
MCCREESubstation-AdjacentTXDallas County345 kV600 MW3.4 yrs73.4
DESOTO SWSubstation-AdjacentTXEllis County345 kV600 MW3.4 yrs73.0
CEDAR HILL SWSubstation-AdjacentTXDallas County345 kV600 MW3.4 yrs72.8
UNKNOWN308252Substation-AdjacentTXEllis County345 kV600 MW3.4 yrs71.9
SEAGOVILLE SWSubstation-AdjacentTXDallas County345 kV600 MW3.4 yrs71.5
TRI-CORNERSubstation-AdjacentTXKaufman County345 kV600 MW3.4 yrs71.3

Nearby internet exchanges

See all datacenter sites in Texas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Skyline Gas Recovery, Ferris, Dallas, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.