Pantex Renewable Energy Project (PREP)
BrownfieldAmarillo, Texas
Pantex Renewable Energy Project (PREP) is a former superfund site in Amarillo, Texas. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 12 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Get alerts
Track Pantex Renewable Energy Project (PREP)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Pantex Renewable Energy Project (PREP), ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| POTTER COUNTY | Substation-Adjacent | TX | Potter County | 345 kV | 600 MW | 1.7 yrs | 60.5 |
| AJ SWOPE | Substation-Adjacent | TX | Potter County | 345 kV | 600 MW | 1.7 yrs | 60.1 |
| ROLLING HILLS | Substation-Adjacent | TX | Potter County | 230 kV | 300 MW | 1.7 yrs | 58.9 |
| RANDALL COUNTY | Substation-Adjacent | TX | Randall County | 230 kV | 300 MW | 1.7 yrs | 58.9 |
| AMARILLO SOUTH | Substation-Adjacent | TX | Randall County | 230 kV | 300 MW | 1.7 yrs | 58.9 |
| NICHOLS | Substation-Adjacent | TX | Potter County | 230 kV | 300 MW | 1.7 yrs | 58.9 |
| HARRINGTON | Substation-Adjacent | TX | Potter County | 230 kV | 300 MW | 1.7 yrs | 58.9 |
| NORTHWEST | Substation-Adjacent | TX | Potter County | 230 kV | 300 MW | 1.7 yrs | 58.8 |
Nearby internet exchanges
- Amarillo Petroleum BuildingAmarillo, TX · 5 networks
See all datacenter sites in Texas →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
Every site and score for Pantex Renewable Energy Project (PREP), Amarillo, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.