J Robert Massengale

Brownfield

Lubock, Lubbock, Texas · City of Lubbock - (TX)

Legacy capacity
107
MW

J Robert Massengale is a natural gas plant in Lubock, Lubbock, Texas, retired 2023-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 107 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity107 MW
Retirement date2023-10-01
EIA plant ID#3604

Grid hookup & remediation

Nearest substation0.0 mi
OperatorCity of Lubbock - (TX)
Operator address230 Massengale Drive, Lubock, TX, 79401
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near J Robert Massengale, ranked by DC Readiness.

Candidate sites near J Robert Massengale
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN303155Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs71.7
TY COOKESubstation-AdjacentTXLubbock County230 kV300 MW3.4 yrs71.1
UNKNOWN303927Substation-AdjacentTXHale County230 kV300 MW3.4 yrs70.2
UNKNOWN300063Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs69.0
UNKNOWN304924Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs68.8
UNKNOWN305684Substation-AdjacentTXLubbock County230 kV300 MW3.4 yrs68.0
TUCOSubstation-AdjacentTXHale County345 kV600 MW3.4 yrs67.7
COTTONWOODSubstation-AdjacentTXHale County345 kV600 MW3.4 yrs66.9

See all datacenter sites in Texas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for J Robert Massengale, Lubock, Lubbock, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.