Aegle Power

Brownfield

Harlingen, Cameron, Texas · Coronado Power Ventures LLC

Legacy capacity
1,282
MW

Aegle Power is a natural gas plant in Harlingen, Cameron, Texas. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,282 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity1,282 MW
EIA plant ID#59924

Grid hookup & remediation

Nearest substation2.4 mi
OperatorCoronado Power Ventures LLC
Operator address24684 FM 1595, Harlingen, TX, 78550
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Aegle Power, ranked by DC Readiness.

Candidate sites near Aegle Power
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN305746Substation-AdjacentTXCameron County345 kV600 MW3.4 yrs74.5
UNKNOWN308524Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs69.7
UNKNOWN306206Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs69.6
WELASCO UNITSubstation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs68.8
UNKNOWN306517Substation-AdjacentTXWillacy County138 kV100 MW3.4 yrs68.4
WESLACOSubstation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs68.1
UNKNOWN303488Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs68.0
UNKNOWN303286Substation-AdjacentTXWillacy County138 kV100 MW3.4 yrs67.9

Nearby internet exchanges

See all datacenter sites in Texas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Aegle Power, Harlingen, Cameron, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.