Ben French

Brownfield

Rapid City, Pennington, South Dakota · Black Hills Power, Inc.

Legacy capacity
25
MW

Ben French is a coal plant in Rapid City, Pennington, South Dakota, retired 2014-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 25 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity25 MW
Retirement date2014-03-01
EIA plant ID#3325

Grid hookup & remediation

Nearest substation2.3 mi
OperatorBlack Hills Power, Inc.
Operator address393 Deadwood Avenue, Rapid City, SD, 57702
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Ben French, ranked by DC Readiness.

Candidate sites near Ben French
SiteTypeStateCountyVoltageCapacityQueue waitScore
LANGESubstation-AdjacentSDPennington County230 kV300 MW1.0 yrs75.8
RAPID CITY DC TIESubstation-AdjacentSDPennington County230 kV300 MW1.0 yrs71.9
SOUTH RAPID CITYSubstation-AdjacentSDPennington County230 kV300 MW1.0 yrs70.8
UNKNOWN131182Substation-AdjacentSDPennington County115 kV100 MW1.0 yrs70.4
NEW UNDERWOODSubstation-AdjacentSDPennington County230 kV300 MW1.0 yrs69.9
Greenfield (UNKNOWN202528 - SOUTH RAPID CI)GreenfieldSDCuster County230 kV300 MW1.0 yrs69.5
UNKNOWN131179Substation-AdjacentSDPennington County115 kV100 MW1.0 yrs69.5
EC Near Ben FrenchGreenfieldSDPennington1.0 yrs68.2

Nearby internet exchanges

See all datacenter sites in South Dakota

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Ben French, Rapid City, Pennington, South Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.