Horry Land Fill Gas Site is a oil plant in Conway, Horry, South Carolina. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 22 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity22 MW
EIA plant ID#7958

Grid hookup & remediation

Nearest substation2.3 mi
OperatorSouth Carolina Public Service Authority
Operator address1880 Hwy 90, Conway, SC, 29526
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Horry Land Fill Gas Site, ranked by DC Readiness.

Candidate sites near Horry Land Fill Gas Site
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN146820Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs74.6
UNKNOWN146861Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs74.2
TAP146860Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs73.6
UNKNOWN121178Substation-AdjacentSCGeorgetown County230 kV300 MW3.7 yrs73.5
UNKNOWN146821Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs73.2
TAP146680Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs73.0
UNKNOWN146844Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs72.9
TAP146870Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs72.7

Nearby internet exchanges

See all datacenter sites in South Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Horry Land Fill Gas Site, Conway, Horry, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.