Buzzard Roost

Brownfield

Chappells, Greenwood, South Carolina · South Carolina Public Service Authority

Legacy capacity
15
MW

Buzzard Roost is a former hydro site in Chappells, Greenwood, South Carolina, retired 2021-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 15 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity15 MW
Retirement date2021-12-01
EIA plant ID#3254

Grid hookup & remediation

Nearest substation0.1 mi
Operator address35797 SC Hwy 34, Chappells, SC, 29037
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Greenwood County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)20,489
Construction employment1,067
Land value$3,514/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate11.08¢/kWh
Industrial power rate7.88¢/kWh
Load growth (FERC-714)1.7%

Water & cooling

Water stressLow
Public water supply4.8 MGD
Industrial water use0.0 MGD
Cooling degree days2,000
Mean annual temp63°F

Hazard, flood & connectivity

FEMA risk index40.0 · Relatively High
Fiber providers7 · 86% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Buzzard Roost — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Buzzard Roost GTnatural gas plant1980.5 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Buzzard Roost

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Buzzard Roost, ranked by DC Readiness.

Candidate sites near Buzzard Roost
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117128Substation-AdjacentSCSaluda County230 kV300 MW1.0 yrs66.6
UNKNOWN116730Substation-AdjacentSCSaluda County230 kV300 MW1.0 yrs66.5
UNKNOWN115989Substation-AdjacentSCNewberry County230 kV300 MW1.0 yrs65.6
UNKNOWN116988Substation-AdjacentSCNewberry County230 kV300 MW1.0 yrs65.5
UNKNOWN113391Substation-AdjacentSCAbbeville County230 kV300 MW1.0 yrs64.9
UNKNOWN113985Substation-AdjacentSCAbbeville County230 kV300 MW1.0 yrs64.9
OZ LexingtonGreenfieldSCLexington——3.7 yrs64.8
OZ GreenwoodGreenfieldSCGreenwood——3.7 yrs64.1

See all datacenter sites in South Carolina →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Buzzard Roost, Chappells, Greenwood, South Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.