Titus

Brownfield

Birsboro, Berks, Pennsylvania · Titus Power, LLC

Legacy capacity
225
MW

Titus is a coal plant in Birsboro, Berks, Pennsylvania, retired 2013-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 225 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity225 MW
Retirement date2013-09-01
EIA plant ID#3115

Grid hookup & remediation

Nearest substation1.1 mi
OperatorTitus Power, LLC
Operator address296 Poplar Neck Road, Birsboro, PA, 19508
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Titus, ranked by DC Readiness.

Candidate sites near Titus
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN171809Substation-AdjacentPALehigh County500 kV1,000 MW3.0 yrs79.1
WESCOSVILLESubstation-AdjacentPALehigh County500 kV1,000 MW3.0 yrs77.7
LIMERICK (500KV SUB)Substation-AdjacentPAChester County500 kV1,000 MW3.0 yrs77.5
UPPER PROVIDENCESubstation-AdjacentPAMontgomery County230 kV300 MW3.0 yrs76.9
Cromby Generating StationBrownfieldPAMontgomery420 MW76.3
CROMBY GENERATING STATIONSubstation-AdjacentPAMontgomery County138 kV100 MW3.0 yrs75.6
HOSENSACK (500 KV SUB)Substation-AdjacentPABerks County500 kV1,000 MW3.0 yrs74.7
UNKNOWN171542Substation-AdjacentPAMontgomery County230 kV300 MW3.0 yrs74.1

Nearby internet exchanges

See all datacenter sites in Pennsylvania

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Titus, Birsboro, Berks, Pennsylvania. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.