Hazelwood Green’s Mill 19 Solar

Brownfield

Pittsburg, Pennsylvania

Legacy capacity
2
MW

Hazelwood Green’s Mill 19 Solar is a former brownfield site in Pittsburg, Pennsylvania. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer brownfield site
Site typeepa_brownfield
Existing capacity2 MW

Grid hookup & remediation

Nearest substation0.9 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former brownfield site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Hazelwood Green’s Mill 19 Solar — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Brunot Islandoil plant514.0 mi—
Pittsburg Airportformer landfill site—0.0 micleanup_complete

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Hazelwood Green’s Mill 19 Solar

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Hazelwood Green’s Mill 19 Solar, ranked by DC Readiness.

Candidate sites near Hazelwood Green’s Mill 19 Solar
SiteTypeStateCountyVoltageCapacityQueue waitScore
BRUNOT ISLANDSubstation-AdjacentPAAllegheny County345 kV600 MW3.8 yrs70.4
Hazelwood Green’s Mill 19 SolarBrownfieldPAAllegheny—2 MW3.8 yrs69.5
CABOTSubstation-AdjacentPAButler County500 kV1,000 MW3.8 yrs69.0
EC Coal Allegheny CountyGreenfieldPAAllegheny County——3.0 yrs67.9
TAP151899Substation-AdjacentPAAllegheny County345 kV600 MW3.8 yrs67.8
EC Coal Allegheny CountyGreenfieldPAAllegheny County——3.0 yrs67.7
EC Near Brunot IslandGreenfieldPAAllegheny——3.0 yrs67.3
CRANBERRYSubstation-AdjacentPABeaver County500 kV1,000 MW3.8 yrs67.3

Nearby internet exchanges

See all datacenter sites in Pennsylvania →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Hazelwood Green’s Mill 19 Solar, Pittsburg, Pennsylvania. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.