Frey Farm Landfill

Brownfield

Conestoga, Pennsylvania

Legacy capacity
3
MW

Frey Farm Landfill is a former landfill site in Conestoga, Pennsylvania. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer landfill site
Site typeepa_brownfield
Existing capacity3 MW
Acreage10 ac

Grid hookup & remediation

Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former landfill site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Get alerts

Track Frey Farm Landfill

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

See all datacenter sites in Pennsylvania →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.