Georgia-Pacific Toledo Mill

Brownfield

Toledo, Lincoln, Oregon · Georgia-Pacific Toledo LLC

Legacy capacity
19
MW

Georgia-Pacific Toledo Mill is a former biomass site in Toledo, Lincoln, Oregon, retired 2013-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 19 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity19 MW
Retirement date2013-04-01
EIA plant ID#58109

Grid hookup & remediation

Nearest substation0.1 mi
Operator address1400 SE Butler Bridge Road, Toledo, OR, 97391
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Lincoln County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)14,855
Construction employment823
Land value$7,580/acre
Datacenter tax incentiveproperty_tax_exemption

Power economics & interconnection

Commercial power rate9.26¢/kWh
Industrial power rate7.23¢/kWh
Load growth (FERC-714)1.0%

Water & cooling

Water stressMedium-High
Public water supply8.7 MGD
Industrial water use11.0 MGD
Cooling degree days300
Mean annual temp49°F

Hazard, flood & connectivity

FEMA risk index22.0 · Relatively Low
Fiber providers5 · 8% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Georgia-Pacific Toledo Mill

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Georgia-Pacific Toledo Mill, ranked by DC Readiness.

Candidate sites near Georgia-Pacific Toledo Mill
SiteTypeStateCountyVoltageCapacityQueue waitScore
TOLEDOSubstation-AdjacentORLincoln County230 kV300 MW6.9 yrs59.3
BURNT WOODSSubstation-AdjacentORBenton County115 kV100 MW6.9 yrs57.7
STEENSEN SS 109Substation-AdjacentORLincoln County115 kV100 MW6.9 yrs54.6
DEPOE BAYSubstation-AdjacentORLincoln County115 kV100 MW6.9 yrs54.6
NEWPORT SS 101Substation-AdjacentORLincoln County115 kV100 MW6.9 yrs54.5
AGATE BEACH SS 108Substation-AdjacentORLincoln County115 kV100 MW6.9 yrs54.4
UNKNOWN208751Substation-AdjacentORLincoln County115 kV100 MW6.9 yrs54.1
DEVILS LAKESubstation-AdjacentORLincoln County115 kV100 MW6.9 yrs53.8

See all datacenter sites in Oregon →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Georgia-Pacific Toledo Mill, Toledo, Lincoln, Oregon is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.