Georgia-Pacific Toledo Mill
BrownfieldToledo, Lincoln, Oregon · Georgia-Pacific Toledo LLC
Georgia-Pacific Toledo Mill is a former biomass site in Toledo, Lincoln, Oregon, retired 2013-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 19 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Lincoln County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Get alerts
Track Georgia-Pacific Toledo Mill
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Georgia-Pacific Toledo Mill, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TOLEDO | Substation-Adjacent | OR | Lincoln County | 230 kV | 300 MW | 6.9 yrs | 59.3 |
| BURNT WOODS | Substation-Adjacent | OR | Benton County | 115 kV | 100 MW | 6.9 yrs | 57.7 |
| STEENSEN SS 109 | Substation-Adjacent | OR | Lincoln County | 115 kV | 100 MW | 6.9 yrs | 54.6 |
| DEPOE BAY | Substation-Adjacent | OR | Lincoln County | 115 kV | 100 MW | 6.9 yrs | 54.6 |
| NEWPORT SS 101 | Substation-Adjacent | OR | Lincoln County | 115 kV | 100 MW | 6.9 yrs | 54.5 |
| AGATE BEACH SS 108 | Substation-Adjacent | OR | Lincoln County | 115 kV | 100 MW | 6.9 yrs | 54.4 |
| UNKNOWN208751 | Substation-Adjacent | OR | Lincoln County | 115 kV | 100 MW | 6.9 yrs | 54.1 |
| DEVILS LAKE | Substation-Adjacent | OR | Lincoln County | 115 kV | 100 MW | 6.9 yrs | 53.8 |
See all datacenter sites in Oregon →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
Every site and score for Georgia-Pacific Toledo Mill, Toledo, Lincoln, Oregon is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.