Mustang

Brownfield

Oklahoma City, Canadian, Oklahoma · Oklahoma Gas & Electric Co

Legacy capacity
531
MW

Mustang is a natural gas plant in Oklahoma City, Canadian, Oklahoma, retired 2017-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 531 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity531 MW
Retirement date2017-12-01
EIA plant ID#2953

Grid hookup & remediation

Nearest substation1.2 mi
OperatorOklahoma Gas & Electric Co
Operator address701 N. Mustang Plant Rd., Oklahoma City, OK, 73127
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Mustang, ranked by DC Readiness.

Candidate sites near Mustang
SiteTypeStateCountyVoltageCapacityQueue waitScore
CIMARRONSubstation-AdjacentOKCanadian County345 kV600 MW3.4 yrs75.0
CANADIAN HILLS WINDSubstation-AdjacentOKCanadian County345 kV600 MW3.4 yrs74.3
MATHEWSONSubstation-AdjacentOKKingfisher County345 kV600 MW3.4 yrs71.9
UNKNOWN118430Substation-AdjacentOKOklahoma County138 kV100 MW3.4 yrs71.8
MINCO WIND II, LLCSubstation-AdjacentOKCanadian County345 kV600 MW3.4 yrs71.6
TAP149232Substation-AdjacentOKOklahoma County138 kV100 MW3.4 yrs71.5
UNKNOWN118472Substation-AdjacentOKOklahoma County138 kV100 MW3.4 yrs71.4
SW 5THSubstation-AdjacentOKOklahoma County138 kV100 MW3.4 yrs71.3

Nearby internet exchanges

See all datacenter sites in Oklahoma

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mustang, Oklahoma City, Canadian, Oklahoma. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.