Cambridge
BrownfieldCambridge, Furnas, Nebraska · City of Cambridge - (NE)
Cambridge is a oil plant in Cambridge, Furnas, Nebraska, retired 2005-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Cambridge, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN131958 | Substation-Adjacent | NE | Furnas County | 115 kV | 100 MW | 3.5 yrs | 63.6 |
| UNKNOWN131959 | Substation-Adjacent | NE | Gosper County | 115 kV | 100 MW | 3.5 yrs | 61.7 |
| UNKNOWN131768 | Substation-Adjacent | NE | Gosper County | 115 kV | 100 MW | 3.5 yrs | 60.0 |
| Greenfield (MCCOOK - UNKNOWN131958) | Greenfield | NE | Red Willow County | 115 kV | 100 MW | 3.5 yrs | 57.8 |
| Greenfield (MCCOOK - UNKNOWN131958) | Greenfield | NE | Red Willow County | 115 kV | 100 MW | 3.5 yrs | 57.8 |
| JOHNSON 2 | Substation-Adjacent | NE | Gosper County | 115 kV | 100 MW | 3.5 yrs | 57.6 |
| EC Near Cambridge | Greenfield | NE | Furnas | — | — | 3.5 yrs | 57.5 |
| EC Near Cambridge | Greenfield | NE | Furnas | — | — | 3.5 yrs | 57.4 |
See all datacenter sites in Nebraska →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Cambridge, Cambridge, Furnas, Nebraska. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.