Skip to content
Gridcensus

C W Burdick

Brownfield

Grand Island, Hall, Nebraska · City of Grand Island - (NE)

Legacy capacity
98
MW

C W Burdick is a natural gas plant in Grand Island, Hall, Nebraska, retired 2017-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 98 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity98 MW
Retirement date2017-09-01
EIA plant ID#2241

Grid hookup & remediation

Nearest substation0.1 mi
Operator address805 E Bischeld, Grand Island, NE, 68801
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near C W Burdick, ranked by DC Readiness.

Candidate sites near C W Burdick
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near C W BurdickGreenfieldNEHall3.5 yrs62.2
UNKNOWN131929Substation-AdjacentNEHamilton County345 kV600 MW3.3 yrs60.8
EC Near C W BurdickGreenfieldNEHall3.5 yrs60.5
EC Near C W BurdickGreenfieldNEHall3.5 yrs60.0
OZ AdamsGreenfieldNEAdams3.5 yrs59.8
EC Near C W BurdickGreenfieldNEHall3.5 yrs59.8
EC Near C W BurdickGreenfieldNEHall3.5 yrs59.0
UNKNOWN131722Substation-AdjacentNEAdams County230 kV300 MW3.3 yrs58.8

See all datacenter sites in Nebraska

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for C W Burdick, Grand Island, Hall, Nebraska. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.