Hauser

Brownfield

Helena, Lewis and Clark, Montana · NorthWestern Energy (MT Hydro)

Legacy capacity
12
MW

Hauser is a former hydro site in Helena, Lewis and Clark, Montana, retired 2023-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 12 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity12 MW
Retirement date2023-09-01
EIA plant ID#2185

Grid hookup & remediation

Nearest substation6.5 mi
OperatorNorthWestern Energy (MT Hydro)
Operator address7150 Hauser Dam Road, Helena, MT, 59602
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Hauser, ranked by DC Readiness.

Candidate sites near Hauser
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN204437Substation-AdjacentMTBroadwater County115 kV100 MW1.1 yrs69.1
UNKNOWN204434Substation-AdjacentMTLewis and Clark County100 kV50 MW1.1 yrs67.8
TAP205602Substation-AdjacentMTBroadwater County115 kV100 MW1.1 yrs67.1
DEAD HEADSubstation-AdjacentMTLewis and Clark County138 kV100 MW1.1 yrs65.1
UNKNOWN207826Substation-AdjacentMTBroadwater County115 kV100 MW1.1 yrs63.8
OZ Lewis and ClarkGreenfieldMTLewis and Clark1.1 yrs61.3
Greenfield (TAP205602 - UNKNOWN201836)GreenfieldMTCascade County115 kV100 MW1.1 yrs60.1
Greenfield (TAP205602 - UNKNOWN201836)GreenfieldMTCascade County115 kV100 MW1.1 yrs59.8

See all datacenter sites in Montana

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.