Viaduct

Brownfield

Cape Girardeau, Cape Girardeau, Missouri · Union Electric Co - (MO)

Legacy capacity
31
MW

Viaduct is a natural gas plant in Cape Girardeau, Cape Girardeau, Missouri, retired 2011-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 31 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity31 MW
Retirement date2011-09-01
EIA plant ID#2096

Grid hookup & remediation

Nearest substation0.0 mi
OperatorUnion Electric Co - (MO)
Operator address263 Old Hwy 61, Cape Girardeau, MO, 63701
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Viaduct, ranked by DC Readiness.

Candidate sites near Viaduct
SiteTypeStateCountyVoltageCapacityQueue waitScore
ESSEXSubstation-AdjacentMOStoddard County345 kV600 MW1.4 yrs70.3
TAP153821Substation-AdjacentMOBollinger County345 kV600 MW4.6 yrs69.4
LUTESVILLESubstation-AdjacentMOScott County345 kV600 MW4.6 yrs69.2
UNKNOWN121880Substation-AdjacentILJackson County138 kV100 MW4.6 yrs66.6
KELSOSubstation-AdjacentMOCape Girardeau County345 kV600 MW4.6 yrs66.1
Greenfield (JOPPA 345 - KELSO)GreenfieldILAlexander County345 kV600 MW4.6 yrs66.1
TAP153686Substation-AdjacentILUnion County138 kV100 MW4.6 yrs66.0
UNKNOWN174145Substation-AdjacentMOCape Girardeau County161 kV100 MW4.6 yrs65.3

See all datacenter sites in Missouri

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Viaduct, Cape Girardeau, Cape Girardeau, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.