Oronogo-Duenweg Mining Belt Superfund Solar Site

Brownfield

Joplin, Missouri

Legacy capacity
2
MW

Oronogo-Duenweg Mining Belt Superfund Solar Site is a former superfund site in Joplin, Missouri. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer superfund site
Site typeepa_brownfield
Existing capacity2 MW
Acreage60 ac

Grid hookup & remediation

Nearest substation0.9 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former superfund site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Oronogo-Duenweg Mining Belt Superfund Solar Site, ranked by DC Readiness.

Candidate sites near Oronogo-Duenweg Mining Belt Superfund Solar Site
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN173548Substation-AdjacentMOJasper County345 kV600 MW1.4 yrs71.5
AsburyBrownfieldMOBarton County345 kV232 MW1.4 yrs69.2
UNKNOWN173548Substation-AdjacentKSCherokee County345 kV600 MW3.5 yrs69.0
UNKNOWN133896Substation-AdjacentMOJasper County345 kV600 MW3.5 yrs68.8
UNKNOWN117571Substation-AdjacentMONewton County161 kV100 MW1.4 yrs67.7
UNKNOWN117514Substation-AdjacentMONewton County161 kV100 MW3.5 yrs66.1
UNKNOWN117512Substation-AdjacentMOJasper County161 kV100 MW1.4 yrs66.0
Greenfield (UNKNOWN107928 - BROOKLINE)GreenfieldMOMcDonald County345 kV600 MW3.4 yrs65.8

See all datacenter sites in Missouri

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.